Well Remediation – BROWNFIELD PROJECT – AKASO 4

We bid for a brownfield project on well remediation and won. We set out and planned for the job, acquiring all necessary equipment that would be needed for the job. Due to the intensity of degradation that had happened to the well, the project was categorised into three phases: well securement, well integrity and well […]...
Blog
Blank Image

Patience at work place

Going through a process or undertaking an unfamiliar task, most times, may seem too difficult and uninteresting. It often requires lots of patience and discipline to go the extra mile or see them to the end. The truth is, the end is usually rewarding if only you can push and persist till then. At Kenyon, we […]...
Blog
Blank Image

Installation of CCU

One of the vital parts of a well is the CCU. This equipment enables emergency shut down of a well to prevent it from explosion and other well challenges such as leaks and oil and gas assets vandalism that could endanger the environment. A CCU is set hydraulically to shut down on any eventuality, keeping […]...
Blog
Blank Image

Installation of BPVs

In brownfield development, one of the important activities carried out in well/Xmas tree repair is the installation of a back pressure valve (BPV). To allow a well that has been in use for a long time to realize its full production potential, some works need to be done on the well, some of which entails […]...
Blog
Blank Image

Solving Well Vandalization Problems

Solving wellhead vandalized cases by Kenyon International Wellhead vandalism is one of the major problems Niger Delta region faces due to the volatility of the area. Rising cases of wellhead vandalism has significantly affected Nigeria’s and oil companies’ sources of revenue in the region. The Alakiri and Olubiri wells suffered severe vandalism. They were both […]...