Well Remediation – BROWNFIELD PROJECT – AKASO 4

We bid for a brownfield project on well remediation and won. We set out and planned for the job, acquiring all necessary equipment that would be needed for the job. Due to the intensity of degradation that had happened to the well, the project was categorised into three phases: well securement, well integrity and well […]...
Wellhead
Blank Image

Elbow Manufacture

Before 45 Degree elbow design 90 Degree elbow design Previous Next Our client had a challenge of fitting elbows into an impossible position on the wellhead, and there they did not have to alter the design of the valve, thus, a technical solution was sought. Kenyon was called upon to provide a solution. The solution […]...